Gogh Solutions JumpModel  are now Coredrive. Read more
Gogh Solutions + JumpModel are now Coredrive.
Services / BLUEPRINT

A structured design engagement that turns requirements into a documented IFS solution, scoped, sized and ready to hand to a delivery team. Ours or anyone else's.

Robotic arms on an IFS-managed production line
THE CHALLENGE

Vague scope is how timelines slip and budgets double. The design decisions get made anyway, just later and under pressure.

CAPABILITIES

Discovery workshops

Business needs captured with the people who own them.

Fit and gap assessment

What standard IFS handles, and what genuinely doesn't.

Integration and data readiness

What connects to what, and who owns which record.

Scope, effort and cost

A defensible estimate you can take to your board.

Adoption and risk analysis

What could go wrong, named before kickoff instead of after.

OUR APPROACH

Every customization we talk you out of is one you never have to test, support or carry through an IFS upgrade. We push hard on that before anyone writes code.

Robotic arms welding a vehicle body on an assembly line
ONE CONNECTED SYSTEM

The blueprint feeds straight into an implementation or an upgrade, so nothing gets relearned between design and delivery.

WHAT'S INCLUDED

Eight deliverables, running the same sequence at two weeks or thirteen.

01

Discover

  • Stakeholder interviews and discovery workshops
  • Current-state process and pain point review
02

Assess

  • Functional fit and gap assessment
  • Reporting, integration and data readiness evaluation
  • Adoption risk and implementation complexity analysis
03

Scope

  • Business metrics tie-back and improvement cycle
  • High-level scope, assumptions and risk identification
  • Next-step investment and roadmap recommendation
IN PRACTICE

See All Customer Stories
case-study-quote

"We expected go-live to be a tough stretch. It wasn't. This was one of the easiest and best go-lives our business has been through. Coredrive felt like part of our team, and they're the kind of partner we'd be comfortable bringing into another important project."

+33% Increase in Technician Productivity
+22% Increase in Equipment Uptime
Scroll to Top